How a day runs

Jobs in, plan the board, load and deliver, close the loop — typed in or pulled from Acumatica / MYOB.

1 · Jobs in

Sales orders, transfers, and collections land in the unassigned park. Filter by age, open a job, or create one from the board.

2 · Plan the board

Drag onto trucks and days. Reorder stops. Keep yesterday’s leftovers visible without losing today.

3 · Proof of load

The loader works today’s list. Photo the load before it leaves. Skip POL if your operation is delivery-only.

4 · Proof of delivery

The driver works the next stop. Photo and signature on the phone. It holds when the site has no signal, then syncs.

5 · Tell the customer

Copy a track link from the job. They see status and proof without creating an account.

6 · Close in the ERP

When you sync from Acumatica or MYOB, shipment truth writes back so the plant’s system of record stays current.